curve-freeform

Upcoming Waterline Improvements 09/13/2021

Leon_Valley_Logo
Dear Leon Valley Resident:

Bravo Construction has been selected to perform work in your area for the City of Leon Valley Waterline Improvements.  The project consists of replacing water mains, service lines, and new gate valves.  The area of construction will be on High Stepper Ln.  (From Walking Gait Dr. to Checkrein Dr.), and Checkrein Dr.  (From High Stepper Ln. to Horse Tail Ln.).   

Work is anticipated to begin September 13, 2021 – October 13, 2021, weather permitting.  Please use caution while traveling in the work zone and associated lane closures.  A road closed to thru traffic may be required at times, however, you will have access to your property.  There may be a brief inconvenience necessary when they are placing a water main in front of your driveways, however, at the end of each day, the trench will be backfilled and safe to drive across.       

General questions or concerns can be directed to the Public Works Assistant Director David Dimaline by calling 210-681-1232 x201. 

Thank you for your cooperation and understanding during construction.  Please do not hesitate to reach out so we may assist your needs.  We apologize in advance for any inconvenience.

Sincerely,
David Dimaline
210-681-1232 x201